Quote Request

In order to progress your enquiry we require the following information:

  • Full site address including post code
  • Full sized and scaled site location plans
  • Indication on plans of the preferred route for gas supply
  • Indication on plans of the preferred termination position for gas supply
  • Whether you require SEL to include in our quotation for an external (GRP) meter kiosk
  • The gas plant’ peak hourly gas requirement (kW)
  • The gas plant’ estimated annual gas requirement (kWh p.a.)

To help you provide us with this information, please download the relevant application form from the links below:

If you intend to install a CHP, booster and/or compressor please also complete our Non Typical Demand Form

Alternatively, if you would like a call back to discuss an enquiry or our products/services please click here

2016-03-10 06.07.47 (2)